Using simulation to make data-informed logistics decisions

21 June 2022 | Case Studies
Developing a simulation model to introduce the proposed Tau Tona link to the simulation model to assist AGA in making data-informed decisions regarding the feasibility.

Using APC to Increase Output and Improve Operations at the Letšeng diamond mine

18 May 2022 | Case Studies
The implementation of APC at Letšeng by 4Sight provided several improvements in key process KPIs.

Using digital-twin simulation to de-bottleneck Letšeng processing plant

25 September 2021 | Case Studies
Gem Diamonds is a leading producer of high-value diamonds. The Group owns the Letšeng diamond mine, the highest achieving average US$ per carat kimberlite mine in the...

Making Accurate Future Decisions for a Stockpile and Train Loading Facility

19 August 2021 | Case Studies
This model focused on a large stockpile operations and train loading facility. It included the train arrivals, loading, slots, capacity evaluation and schedule optimisation.

Improving Cave Mine Production Performance through Rapid Simulation

08 July 2021 | Case Studies
Simulation Engineering Technologies, or SET, specialises in developing computer simulation models that can evaluate the production potential of a block cave mine. Block...

Helping Storage Reach Maximum Capacity for a Canadian Rail Company

06 July 2021 | Case Studies
This project was a complete mine-to-port logistical study which integrated mining, transportation and shipping systems to provide a holistic view of the intermodal systems.

Contact us

T: +27126402600    
E: This email address is being protected from spambots. You need JavaScript enabled to view it.