Enhancing Power Generation at Kibali Gold Mine with Mtell Asset Performance Management

09 March 2025 | Case Studies
Kibali Gold Mine reached out to 4Sight, which has implemented the AspenTech Mtell Asset Performance Management (APM) solution. Kibali Gold Mine operates in a challenging...

Case Study: Simulation-Driven Insights for Strategic Plant Upgrades

15 November 2024 | Case Studies
Optimising Mogalakwena North (Anglo American Platinum) using Simulation-driven insights for strategic plant upgrades

Success Case - Modernizing Production Through Automation: A Success Case for Ingrain’s Carbon Plant Upgrade

04 October 2024 | Case Studies
Ingrain sought to modernize its production capabilities through a significant upgrade to its automation systems. The primary objective was to replace outdated technologies...

Success Case - Resolution Copper: The benefits of pre-feasibility phase insights

19 May 2024 | Case Studies
Navigating the pre-feasibility phase of North America's largest proposed underground copper mine.

Success Case - The Benefit of Mine Electrification Simulation

18 May 2024 | Case Studies
4Sight Simulation, in collaboration with a software partner (SimMine), participated in the EMC Simulation Crowd Challenge and was selected from 179 participants to develop...

Case Study: Citrus Research International

25 April 2024 | Case Studies

Contact us

T: +27126402600    