A leading mining company - Ore Handling Project

25 May 2021 | Case Studies
A leading mining company, specializing in platinum group metals. operates four shallow mechanised underground mines, one open-pit and two concentrators. Ore is transported...

Mogalakwena North Concentrator Simulation Study

20 May 2021 | Case Studies
Anglo American Platinum requested a dynamic simulation of the Mogalakwena North Concentrator to review plant design changes required for the proposed upgrades. From the...

Determining The Infrastructure for a Pit-to-Port Operation in Mozambique

04 May 2021 | Case Studies
This project was part of a pre-feasibility study of a line from loading site in Mozambique to a port. The model includes logistics from the mine to the loading site, rail...

Life of Mine Extension Feasibility Study of Mponeng Mine

13 April 2021 | Case Studies
AngloGold Ashanti’s Mponeng mine is located in South Africa’s Gauteng province. After the successful completion of the Pre-Feasibility study for mining below the 120...

Warehouse Slotting Optimisation Case Study – DSV

09 April 2021 | Case Studies
DSV, a Global Logistics and Warehousing company, requested developing a slotting model for the initial slotting of products into a warehouse. This model will serve as a...

Simulating Underground and Surface Material Handling Operations

02 March 2021 | Case Studies
This project was a simulation-based study that investigated the potential of a major mining company’s current and proposed operational structure. The study was to...