Room and Pillar Mine Optimisation Model

05 July 2021 | Case Studies
An Anglo-American Platinum (Anglo)’s room and pillar platinum mine is in the process of designing two new declines. As part of this process a dynamic simulation model for...

Why Do We Simulate? – Improving Queueing Systems & Using Simulation as a Business Tool

15 June 2021 | Case Studies
Queuing forms a part of everyday life, whether it is waiting for a cashier at a grocery store, being placed on hold for the next available customer service representative...

A Leading animal feed manufacturer upgrades their - SCADA, PLC & MCC

07 June 2021 | Case Studies
We secured a project at one of South Africa’s leading animal feed manufacturers, having a production capacity of approximately 1 million tons per year. They have seven...

Determining the Optimal Rail Demand in a Surface Rail Operation

01 June 2021 | Case Studies
In this project, a simulation model was completed for large stockpile operations and train loading facility within South Africa. The model included train arrivals, loading,...

A market leader in the tyre manufacturing industry upgrades their Control System

25 May 2021 | Case Studies
A leader in the automotive industry, evolving from a premium tire producer to a mobility solutions provider. A tyre manufacturer required assistance with an upgrade of...

A leading mining company - Ore Handling Project

25 May 2021 | Case Studies
A leading mining company, specializing in platinum group metals. operates four shallow mechanised underground mines, one open-pit and two concentrators. Ore is transported...

Contact us

T: +27126402600    
E: This email address is being protected from spambots. You need JavaScript enabled to view it.