Success Case - Resolution Copper: The benefits of pre-feasibility phase insights

19 May 2024 | Case Studies
Navigating the pre-feasibility phase of North America's largest proposed underground copper mine.

Success Case - The Benefit of Mine Electrification Simulation

18 May 2024 | Case Studies
4Sight Simulation, in collaboration with a software partner (SimMine), participated in the EMC Simulation Crowd Challenge and was selected from 179 participants to develop...

Success Case - Energy Saving CTP Thuthuka Packaging

03 July 2023 | Case Studies
Energy monitoring is one of the solutions we provide to our customers to determine their exact energy consumption and allow them to effectively monitor and gauge their...

Success Case - Reckitt Benckiser Group - Process Control System (PCS) Upgrade

07 July 2022 | Case Studies
The Reckitt Group approached 4Sight’s Operational Technology team for a complete Process Control System (PCS) Upgrade

Using simulation to make data-informed logistics decisions

21 June 2022 | Case Studies
Developing a simulation model to introduce the proposed Tau Tona link to the simulation model to assist AGA in making data-informed decisions regarding the feasibility.

Using APC to Increase Output and Improve Operations at the Letšeng diamond mine

18 May 2022 | Case Studies
The implementation of APC at Letšeng by 4Sight provided several improvements in key process KPIs.